Working on the Strand underpass in London required controlled demolition work to avoid damaging the Victorian vaults.
The photograph shows a hydraulically powered concrete muncher in action.
Tarmac surfacing | Block paving | Drainage | Resin bonded gravel | Groundwork | Structured concrete | Plant hire | UK
Specialising in all types of groundwork and plant hire in Southern England